- IT Office Moves
What to Do with Old IT Equipment After an Office Move
4 Oct, 2025
Relocate servers, racks and network infrastructure across London with specialist engineers who treat your hardware like their own.
Full backups verified before disconnection and integrity checks completed after reconnection — your data is never at risk.
Servers, UPS units and networking gear transported in anti-static, shock-absorbing cases by qualified engineers.
Every relocation follows a documented plan with assigned owners, milestones and rollback procedures.
Relocating IT infrastructure is one of the highest-risk activities a business can undertake — a single dropped server or misconfigured switch can cost hours of downtime. Cloudswitched specialises in infrastructure relocation for London businesses, applying rigorous project management and hands-on engineering to ensure every piece of equipment arrives safely and is operational before your team returns to work.
We document every device, connection and dependency before the move begins, identifying single points of failure and building contingency into the plan.
Equipment is powered down in the correct order, labelled for identification and rebuilt at the new site following the exact documented configuration.
Every server, switch, firewall and access point is tested against a predefined checklist before the environment is handed back to your team.
We take verified backups of every server and critical system before disconnection. At the new site, we run integrity checks against the pre-move baseline to confirm that all data is intact and accessible. In the unlikely event of an issue, the backup provides an immediate recovery path.
Yes. We handle moves between co-location facilities, on-premise server rooms and cloud environments. For data centre migrations we coordinate with both facilities to arrange access windows, power provisioning and cross-connect installations.
A small server room with two to three racks can usually be relocated over a single weekend. Larger environments with complex dependencies may require a phased approach spread over two or three weekends to minimise risk and avoid extended downtime.
Every relocation plan includes documented rollback procedures. If a critical issue is detected during rebuild, we can restore services at the original site using the pre-move backups while the problem is investigated and resolved.
Yes. We include a post-move support period — typically two weeks — during which any snagging issues are resolved at no additional cost. Many clients also transition to one of our ongoing managed support packages for continued peace of mind.
Limited time offer - valid until 31/05/2026
Tell us what needs to move and where, and we'll deliver a costed relocation plan with a clear timeline.
Submit your details and one of our friendly team members will be in touch shortly
Powered by industry-leading technologies including SolarWinds, Cloudflare, BitDefender, AWS, Microsoft Azure, and Cisco Meraki to deliver secure, scalable, and reliable IT solutions.