- Database Reporting
Custom Reporting & Dashboard Development Cost in the UK in 2026
12 Apr, 2026
Relocating servers, network equipment and workstations to new premises in Chatham - planned around your trading hours, tested before your team walks in, and supported on the day itself.
We schedule the physical move for evenings and weekends as standard, so your business keeps trading through the working week.
Every server, workstation and peripheral is logged from disconnection to reconnection, with secure, insured transport throughout.
Every workstation, printer, phone and application is checked and working before your team sits down at their new desks.
Moving premises is disruptive enough without IT problems on top of it. Our office move service starts with a full audit of your existing servers, workstations, printers, phone systems and network equipment, then builds a migration plan aligned to your schedule. We design the network for your new premises - structured cabling, Wi-Fi planning, server room layout and power requirements - coordinate the internet and phone line transition with your providers, and handle the safe disconnection, secure transport and reconnection of every piece of hardware. Every system is tested and working before your staff arrive, with engineers on hand on move day and through the following week. It's a fixed quote after a free consultation, delivered remote-first from our City of London base, with on-site visits for the physical work that genuinely needs hands.
Chatham's economy has been reshaped by decades of regeneration around its naval heritage. The transformation of the Historic Dockyard Chatham has helped turn a working naval yard into a hub for heritage, enterprise and creative activity, while the Universities at Medway campus is driving further innovation and enterprise in the town. Ongoing development at Rochester Riverside is bringing further commercial investment into the wider Medway area, and together these changes mean organisations across education, engineering, creative industries, retail, maritime heritage and technology are relocating into new premises, expanding, or consolidating multiple sites more often than before. Wherever your move falls in that mix, the IT side needs the same careful handling: an inventory of what you have now, a plan for what the new site needs, and a team on hand to make the transition invisible to your staff and customers.
A lot of the space businesses are moving into around Chatham - whether inside the Historic Dockyard's enterprise buildings or as part of the newer development at Rochester Riverside - is newly fitted out, which means server rooms, cabling routes and Wi-Fi coverage often need designing from scratch rather than simply replicated from an old office. We work directly with your fit-out contractors to plan cabling, server room layout and power requirements before the move date, so the network is ready the moment you get the keys.
Chatham is well connected into central London, with Southeastern Railway services running to Bank in around 45 minutes from St Pancras or Victoria. That link means the hands-on parts of your move - hardware relocation, cabling and reconnection - can be scheduled and staffed reliably, whether your new premises sit near the Historic Dockyard, Fort Amherst, the Royal Engineers Museum, or elsewhere across the town.
Every move starts with a full audit of your servers, workstations, printers, phone systems and network equipment, followed by a migration plan built around your schedule rather than a generic checklist. Weekend and out-of-hours moves are standard practice, so relocating premises doesn't mean losing trading days.
Once hardware is reconnected at the new site, we test every workstation, printer, phone line and application before staff walk in. Engineers stay on hand on move day and through the following week to resolve anything that comes up, with a post-move review once things have settled.
From first conversation to a fully working new office - our process keeps IT off your critical path.
We inventory your servers, workstations, printers, phone systems and network equipment, then build a migration plan aligned to your move date.
We plan structured cabling, Wi-Fi coverage, server room layout and power requirements for the new premises, coordinating directly with your fit-out contractors and ISP.
Servers, workstations, printers and peripherals are safely disconnected, transported securely and insured, and reconnected on site - with chain-of-custody documentation throughout.
Every system is tested before staff arrive. Engineers are on hand on move day and through the following week, plus a post-move review once you're settled.
We handle the whole relocation from audit to post-move support, rather than leaving you to coordinate separate specialists for cabling, hardware transport and telecoms yourself.
Every server, workstation and peripheral is logged with chain-of-custody documentation from disconnection through to reconnection, moved via secure, insured transport.
Weekend and out-of-hours moves are standard practice, so the physical relocation doesn't cost you trading days.
We're delivered remote-first from our City of London base, with engineers on site in Chatham for the packing, transport and reinstallation work that genuinely needs hands.
It's a fixed quote after a free consultation - no hourly billing surprises once the move is under way.

We treat an office move as an IT project, not just a van and a to-do list. Here's what that means in practice.
Every server, workstation and peripheral is logged from disconnection to reconnection, so nothing goes missing between your old office and your new one.
We schedule the physical relocation for evenings and weekends by default, so your business keeps trading through the working week.
We coordinate directly with your ISP, landlord and cabling contractors, so you're not relaying messages between three suppliers while trying to run your business.
Planning, coordination and testing are managed remotely from our City of London base, with engineers on site in Chatham for the packing, transport and reinstallation work that genuinely needs hands.
We staff move day itself and stay available through the following week to resolve anything that comes up immediately, rather than leaving you to log a ticket and wait.
You get a fixed quote after a free consultation, based on your actual inventory and move requirements, so there are no surprise invoices once moving day arrives.
We design your new network around open standards, not proprietary systems that tie you to us. If you need to change suppliers later, we'll hand everything over cleanly.
Once you're settled, we carry out a post-move review to catch anything that needs adjusting, rather than considering the job done the moment the last box is unpacked.
Every workstation, printer, phone line and application is checked and working before staff arrive at the new premises, not discovered broken on the first morning.
Businesses relocating in Chatham depend on network infrastructure that's properly planned before the move, not patched together afterwards - structured cabling, Wi-Fi coverage and server room layout sized correctly for the new premises, alongside a clean handover of internet and phone services from the old site. Getting this right at the point of a move avoids weeks of small IT problems once staff are back at their desks.
Chatham is a Medway town whose economy has been reshaped by the regeneration of its naval heritage. The Historic Dockyard Chatham has become a focal point of that transformation, and alongside it the Universities at Medway campus is driving further innovation and enterprise in the town. The town's economy today spans education, engineering, creative industries, retail, maritime heritage and technology.
Ongoing development at Rochester Riverside is bringing further commercial investment to the wider Medway area, adding to the pace of change around Chatham. Landmarks including the Historic Dockyard Chatham, Fort Amherst and the Royal Engineers Museum sit alongside this newer commercial and residential growth.
Getting here: Chatham is served by Southeastern Railway, with services connecting into central London - around 45 minutes to Bank from St Pancras or Victoria - making it straightforward for our engineers to reach site for the hands-on parts of an office move.
Medway Town
A naval heritage town transformed by the regeneration of the Historic Dockyard and the Universities at Medway campus, with further investment arriving via Rochester Riverside. Its economy spans education, engineering, creative industries, retail, maritime heritage and technology - and it's about 45 minutes from central London by Southeastern Railway.
IT office moves
Full-service IT relocation covering the pre-move audit, network design, hardware relocation, ISP and telecom coordination, and testing and support that gets a business back to work with minimal disruption.
IT office moves Chatham
Serving businesses relocating in and around Chatham, from Historic Dockyard enterprise space to premises near the new Rochester Riverside development, with engineers on hand for the physical move.
Got questions about moving your Chatham office? We've answered the most common ones below. If you need more detail, get in touch.
We recommend starting the pre-move IT audit and planning at least four to six weeks before your move date, particularly if the new premises need structured cabling or server room work coordinated with fit-out contractors. Simpler moves can be turned around more quickly - we'll confirm timing at your free consultation.
Yes, weekend and out-of-hours moves are standard practice for us, precisely so the physical relocation doesn't cost your business a trading day. We plan the move around your schedule, not the other way round.
Every server, workstation, printer and peripheral is logged before disconnection, moved via secure, insured transport, and checked against that log on arrival - full chain-of-custody documentation from your old office to your new one.
Yes, we coordinate the internet and phone line transition with your providers, including agreeing installation dates and testing the connections at the new premises before go-live, so you're not managing multiple supplier calls yourself.
It shouldn't happen, because every workstation, printer, phone line and application is tested and confirmed working before staff arrive - but we keep engineers on hand on move day and through the following week to resolve anything that does come up immediately.
Both, depending on what you need. We plan structured cabling, Wi-Fi coverage, server room layout and power requirements for the new site, then relocate and reconnect your existing hardware into that design rather than simply replicating your old setup.
Yes, for premises that are still being fitted out we work directly with your contractors on cabling routes, server room layout and power requirements ahead of the move date, so the network is ready as soon as you have access.
It's a fixed quote after a free consultation, based on the size of your inventory, the complexity of the new site's network requirements, and your preferred move timing. There's no published price list because every move is different.
Limited time offer - valid until 31/05/2026
We believe that communication is key to any successful partnership. Submit your details and one of our friendly team members will be in touch with you shortly.
Submit your details and one of our friendly team members will be in touch with you shortly
Powered by industry-leading technologies including SolarWinds, Cloudflare, BitDefender, AWS, Microsoft Azure, and Cisco Meraki to deliver secure, scalable, and reliable IT solutions.
12 Apr, 2026
18 Mar, 2026
27 Feb, 2026
Powered by industry-leading technologies including SolarWinds, Cloudflare, BitDefender, AWS, Microsoft Azure, and Cisco Meraki to deliver secure, scalable, and reliable IT solutions.
22 Sep, 2026
A hybrid office relocation is a different problem from the one most move checklists were written to solve. The traditional plan treats the building as the unit...
21 Sep, 2026
Somewhere between fifteen and sixty staff, almost every UK business has the same argument. The IT has stopped being something the office manager can absorb...
20 Sep, 2026
Copilot ROI measurement is the conversation that arrives about ten months after the licences do. The rollout went well enough, people say they like it, and...