IT Infrastructure Relocation in London for Printing & Packaging

Specialist IT infrastructure relocation for printing and packaging companies in London, minimising downtime and ensuring every server, switch, and workstation arrives operational.

Zero Data Loss Guarantee

Full backups verified before disconnection and integrity checks completed after reconnection — your data is never at risk.

Specialist Hardware Handling

Servers, UPS units and networking gear transported in anti-static, shock-absorbing cases by qualified engineers.

Structured Project Delivery

Every relocation follows a documented plan with assigned owners, milestones and rollback procedures.

IT infrastructure relocation specialists for printing and packaging companies in London.

Moving the IT infrastructure of a print company requires meticulous planning. Servers hosting print files, job specifications, and production schedules must be safely decommissioned, transported, and recommissioned with zero data loss. Cloudswitched specialises in IT infrastructure relocation for printing and packaging companies in London, handling servers, network equipment, workstations, and EFI PrintSmith configurations with minimal downtime.

How it works for Printing businesses

A clear, structured process from consultation to ongoing support.

1

Pre-Move Risk Assessment

We document every device, connection and dependency before the move begins, identifying single points of failure and building contingency into the plan.

2

Controlled Decommission and Rebuild

Equipment is powered down in the correct order, labelled for identification and rebuilt at the new site following the exact documented configuration.

3

Comprehensive Post-Move Testing

Every server, switch, firewall and access point is tested against a predefined checklist before the environment is handed back to your team.

IT Infrastructure Relocation in London for Printing

Server Migration

Safe decommissioning, transport, and recommissioning of servers hosting your print files, job specifications, and production schedules, with full data integrity verification at the new site.

Network Decommission and Rebuild

Complete network teardown at your current print shops and rebuild at the new London location, optimised for EFI PrintSmith and Tharstern performance.

Workstation Relocation

Every workstation, monitor, and peripheral used by your print managers and prepress operators is labelled, transported, reconnected, and tested at the new site.

Zero-Downtime Planning

Weekend and out-of-hours migration options for printing and packaging companies that cannot afford any interruption to print files, job specifications, and production schedules access.

Need to relocate critical IT infrastructure without downtime?

Infrastructure Relocation Services

Full infrastructure audit and dependency mapping
Pre-move backup and verification
Controlled power-down and disconnection
Anti-static transport and rack rebuilds
Network reconfiguration and testing
Post-move validation and sign-off

Why Printing businesses choose us

Specialist IT relocation engineers with data centre experience

Full asset audit and labelling before any equipment is moved

Tested reconnection and verification procedures for EFI PrintSmith and Tharstern

Weekend and out-of-hours migration options for printing and packaging companies

Comprehensive insurance covering servers, switches, and workstations

Post-migration monitoring for 72 hours to catch any issues early

IT Infrastructure Relocation in London for Printing

Infrastructure Relocation — Step by Step

A methodical approach that eliminates guesswork and minimises risk.

01

Discovery and Documentation

Every rack, patch panel, VLAN and IP address catalogued before work begins.

02

Backup and Snapshot

Full system backups and VM snapshots taken and verified to provide a rollback safety net.

03

Safe Decommission

Servers and networking gear powered down in sequence, labelled and securely packaged for transport.

04

Physical Relocation

Equipment moved in specialist cases by our engineers — never entrusted to general couriers or movers.

05

Rack Build and Cabling

Hardware mounted, cabled and powered up at the new site following the documented rack layout.

06

Validation and Handover

Full system testing against the pre-move baseline, followed by formal sign-off and updated documentation.

Frequently Asked Questions

We relocate servers, network switches, firewalls, UPS systems, workstations, monitors, printers, and telephony equipment. For printing and packaging companies, we also handle specialist hardware connected to EFI PrintSmith and Tharstern systems.

Yes. Every server migration includes pre-move backups, careful decommissioning, professional transport, and verified recommissioning. We test that all print files, job specifications, and production schedules are intact and accessible before your print managers and prepress operators resume operations.

Yes. Most print IT relocations are scheduled for weekends or evenings to minimise business impact. We plan the migration around your operational requirements so your print managers and prepress operators return to fully functioning systems.

Our engineers design and install the complete network infrastructure at your new London location, including cabling, switch configuration, Wi-Fi deployment, and firewall rules. We optimise the network for EFI PrintSmith and Tharstern performance.

We provide 72 hours of post-migration monitoring and on-site support at your new London print shops. Any issues with print files, job specifications, and production schedules access, network performance, or workstation connectivity are resolved immediately by our on-site engineers.

Technology Stack

Powered by industry-leading technologies including SolarWinds, Cloudflare, BitDefender, AWS, Microsoft Azure, and Cisco Meraki to deliver secure, scalable, and reliable IT solutions.

SolarWinds
Cloudflare
BitDefender
AWS
Hono
Opus
Office 365
Microsoft
Cisco Meraki
Microsoft Azure

Latest Articles

18
  • Google Ads & PPC

Google Ads for Recruitment: Attracting Top Talent

18 Mar, 2026

Read more
11
  • Cyber Security

Common Reasons Businesses Fail Cyber Essentials Plus

11 Jun, 2026

Read more
9
  • Cyber Security

How to Handle Security Patches and Updates Effectively

9 Feb, 2026

Read more

Enquiry Received!

Thank you for getting in touch. A member of our team will review your enquiry and get back to you within 24 hours.