- Database Reporting
Custom Reporting & Dashboard Development Cost in the UK in 2026
12 Apr, 2026
A complete wifi installation for business premises — structured cabling, switches, Cisco Meraki access points and a firewall, delivered as one project rather than a stack of separate suppliers.
Cabling, network hardware, wifi and firewall are designed and installed together, so nothing gets left as somebody else's problem.
We work to your fit-out or move-in date, so your network is live and tested before the first desk is occupied.
Every device is set up on Cisco Meraki's cloud platform, giving you full visibility and control from the moment you move in.
Moving into a new office or fitting out a premises for the first time means starting a network from nothing — no existing cabling to build on, no access points already mounted, often not even a firewall in place yet. A wifi installation for business premises at this stage needs to cover structured cabling, network switches, wireless access points and security together as one design, rather than bolting a router onto whatever cabling the previous tenant left behind. We design and install the full network as a single project, so everything from the boardroom to the far corner of the warehouse gets proper coverage from day one.
The businesses that struggle most are the ones who treat wifi as an afterthought in a bigger fit-out or office move, ordering a consumer router at the last minute because the desks have arrived and nobody can get online. That approach almost always means a second, more expensive project a few months later once the gaps become obvious — dead spots in meeting rooms, no separate guest network, and cabling that was never properly labelled. Planning the network alongside the rest of your move, with a proper design before any cable is run, avoids that rework entirely. It also tends to be cheaper in the long run — running an extra cable while walls and floor voids are already open costs a fraction of what it costs to open them back up a year later.
We start with your floor plan and headcount, designing structured cabling runs, switch locations and wireless access point placement before any work begins on site. Cabling is installed and properly labelled, switches and a firewall are configured, and Cisco Meraki access points are mounted and set up with staff and guest networks segregated from the outset. Everything is tested before handover, so your team walks into a fully working network on day one rather than a series of teething problems.
We deliver business network installations across the UK, coordinating design and installation teams wherever your new premises is based. Our home base is the City of London, with on-site coverage there and installation teams arranged elsewhere in the country.
A ten-desk office needs a very different installation to a warehouse-and-office combination or a multi-floor headquarters. We scope cabling runs, switch capacity and access point count to your actual premises, not a generic package.
Every business network installation we deliver covers the same core elements, whatever the size of your premises.



Cabling, switches and access points are all planned against your floor plan first, so the physical installation follows a design rather than being figured out on the day.
We work to your fit-out schedule, so the network is live and tested before your team's first day in the new premises, not weeks afterwards.
From floor plan to a fully tested network — our process keeps installs predictable.
We review your floor plan and headcount, designing cabling runs, switch locations and access point placement.
You get a fixed price for the full installation, agreed before any cabling is run or hardware ordered.
Cabling, switches, firewall and wireless access points are installed to the agreed design, timed to your move-in date.
Every element is tested before handover, so your team moves into a network that already works.
A wifi installation for business premises should be designed once, properly, rather than patched together as gaps become obvious. We plan cabling, switches, firewall and wireless access points as a single project, so nothing falls between suppliers.
Every access point is set up on Cisco Meraki's cloud platform from day one, giving you full network visibility from the moment you move in, not months later once someone finally installs proper management tools.
We work to your fit-out and move-in timeline, coordinating with electricians and other contractors where needed, so the network is one less thing to worry about on moving day.
As part of our cloud networking service line, we also handle connectivity — leased lines and business broadband — VoIP and network admin, so your new premises gets a properly specified internet connection to match the network we're installing.
Once you're live, our managed IT support keeps things running, with 24/7 monitoring and a 99% SLA guarantee available from £20 per user per month.
We also plan for growth from the outset. Cabling and switch capacity are specified with headroom for additional desks or a second phase of the fit-out, so adding staff later doesn't mean ripping out cabling that was sized too tightly the first time. And because everything is documented properly at handover, any future IT provider — including your own in-house team if you build one — inherits a network they can actually understand, not a black box only we know how to maintain.
We're also mindful that a new premises rarely means just wifi. Door entry systems, CCTV, till or EPOS terminals and meeting room displays all typically need a network connection too, and factoring those into the cabling plan from the start avoids an awkward retrofit once the fit-out is finished and the walls are closed up.

Every installation is scoped after a design review, so pricing is agreed upfront with no hidden costs.
A standalone network design and fixed quote
Cabling, switches, firewall and wifi end to end
Installation plus ongoing monitoring and support
Multi-site rollouts to a consistent standard
A new premises deserves a network designed once, properly. Here's what sets our approach apart.
Cabling, hardware, wifi and firewall are designed and installed together, so nothing gets left as somebody else's responsibility.
Every access point and switch is cloud-managed from the outset, giving you full visibility as soon as you move in.
We coordinate with your fit-out schedule and other contractors, so the network is ready before your team arrives.
Firewall configuration and network segregation are part of the design from the start, not added later once gaps appear.
Network installs are scoped alongside connectivity, VoIP and cloud email, so your new premises works as one coherent system.
Cabling and switch capacity are specified with headroom, so adding desks later doesn't mean redoing the network.
You receive documentation of the design and cabling, so any future IT provider can understand and maintain the network.
We deliver network installations to businesses across the UK, scaling the design and installation team to match your premises.
Costs are agreed after a design review, so you know what the full installation will cost before work begins.
A wifi installation for business premises has to be planned around the same practical constraints wherever it's delivered — a fixed fit-out schedule, a floor plan that isn't finalised until late in the process, and contractors who all need to coordinate around each other. Whether you're opening a single office or rolling out a consistent network standard across several sites, planning cabling, hardware and wifi as one project keeps the whole move predictable.
A handful of issues turn up repeatedly in networks that weren't properly planned before a move. Cabling gets installed by an electrician as an afterthought, without proper labelling or a plan for where switches and access points will actually sit, which means a simple future fault turns into hours of tracing cables through walls. Wifi gets treated as a same-day purchase once desks are already in place, resulting in a consumer router covering a fraction of the floor space it needs to. Security is often the biggest gap — no firewall, no network segregation, and a guest network that either doesn't exist or shares the same access as every staff device. Planning the full network alongside the rest of a fit-out, rather than reacting to gaps once the team has already moved in, avoids all of this. It's also common to see businesses discover, only after moving in, that the internet connection ordered for the building can't actually support the number of staff and devices now on site — scoping connectivity capacity at the same time as the network design avoids that particular surprise on day one.
We deliver business network installations to companies moving into new premises across the UK, coordinating design and installation teams regardless of where the site is based. Our base is the City of London, with on-site coverage there and installation teams arranged elsewhere in the country.
Premises types: We've installed networks in standalone offices, mixed office-and-warehouse units, multi-floor headquarters and co-working suites, adjusting the design to match each layout and use case.
Getting started: Every installation begins with a design review against your floor plan and a fixed quote, so you know exactly what you're getting and what it costs before work begins.
Coverage
From single-office fit-outs to multi-site rollouts, our network installation team designs and delivers UK-wide, with the same planning discipline on every project.
wifi installation for business
Full network installation for new business premises covering structured cabling, switches, firewall and Cisco Meraki wireless access points.
structured cabling uk
Properly labelled structured cabling installation for new and existing premises, designed to support the network for years to come.
Got questions about installing a network in your new premises? We've answered the most common ones below.
Cost depends on the size of the premises, the amount of cabling required and the number of access points needed. We provide a fixed quote after reviewing your floor plan.
A single-office installation can typically be designed and completed within a few weeks, timed to your fit-out schedule. Larger premises take longer to plan properly.
Yes, we design and install structured cabling, switches, firewall configuration and wireless access points as a single project, rather than treating wifi in isolation.
Yes, we plan installation around your fit-out and move-in schedule, coordinating with electricians and other contractors so the network is ready in time.
Yes, staff and guest networks are segregated by default on every installation we deliver.
Yes, we scope connectivity — leased lines or business broadband — alongside the network design, so your internet connection matches the capacity you need.
We deliver multi-site rollouts to a consistent network standard, so your second office matches the design and management of the first.
Yes, our Managed Network plan adds 24/7 monitoring and support on top of the installation, backed by our 99% SLA guarantee, from £20 per user per month.
Limited time offer — valid until 31/05/2026
We believe that communication is key to any successful partnership. Submit your details and one of our friendly team members will be in touch with you shortly.
Submit your details and one of our friendly team members will be in touch with you shortly
Powered by industry-leading technologies including SolarWinds, Cloudflare, BitDefender, AWS, Microsoft Azure, and Cisco Meraki to deliver secure, scalable, and reliable IT solutions.
12 Apr, 2026
18 Mar, 2026
27 Feb, 2026
Powered by industry-leading technologies including SolarWinds, Cloudflare, BitDefender, AWS, Microsoft Azure, and Cisco Meraki to deliver secure, scalable, and reliable IT solutions.
24 Aug, 2026
Almost every UK business runs on spreadsheets somewhere, and for most of them database reporting automation is the single change that would give the leadership...
23 Aug, 2026
AI code review has moved from novelty to default in UK development teams inside about eighteen months. Pull requests now arrive pre-annotated by a model,...
22 Aug, 2026
Google Ads wasted spend is the single most recoverable line item in most UK SME marketing budgets. It is not a strategy problem and it is rarely a creative...